1. 626.
    0
    for item A, planners use a lot size of 75. For items B and D, Silver-Meal Heuristic is used. For item C, they use lot-for-lot production scheme to determine the production lot size. Each order costs $300 and holding cost is $0.1 per unit per week . No backorders are allowed. MPS results dictate the following requirements for item A:
    ···